Structured cabling · broadband changeovers · Wi-Fi coverage — with a certified handover packsupport@dvdgroup.services
Densely patched switch rack with illuminated fibre leads

Wired networks.
Built properly.
Certified & documented.

DV&D Group designs, installs and maintains the physical layer your business runs on — structured cabling, broadband changeovers and Wi-Fi coverage, finished with a labelled, tested handover pack. Not a shrug.

Est. 1999SIC 61100 · Wired telecommunicationsCompanies House 03850490Serving businesses across Europe
1999
Trading since — incorporated 29 September 1999
61100
SIC class: wired telecommunications activities
5
Service lines, survey through maintenance
1
Accountable contractor for the whole physical chain
Worked to TIA‑568 C.2 ISO/IEC 11801 EN 50173 BS 7671 Wi‑Fi 6 / 6E

Sound familiar?

Most “network problems” are physical-layer problems. We work the layer everyone else skips.

“It drops out. Again.”

Every mystery outage we’re called to ends up being physical: a mis-punched link, a saturated access point, a cable nobody labelled. We find it, fix it and prove it with test results.

Wi-Fi coverage →

“The cabinet is a museum.”

Patch panels from three ISPs, cables under tension, zero labels. We re-terminate, dress and document the lot — so the next engineer doesn’t start from zero.

Structured cabling →

“Nobody owns the fix.”

The ISP blames the cabling. The cabling contractor blames the IT company. We survey, build and test the whole physical chain — one number to call, one throat to choke.

Maintenance SLA →

Straight answers

The five things every client asks before the first visit.

Which areas do you cover?
We are registered in Chichester, West Sussex, and deliver surveys, installations and maintenance for business premises across Europe, coordinating multi-site rollouts remotely with local access windows agreed in advance.
Are you an ISP? Do you resell lines?
No. Broadband lines are contracted directly between you and your internet provider. We specify, configure and cut over everything on your side of the wall — and we never mark up a line rental.
Will the works disrupt our trading day?
Where premises demand it we work evenings, weekends or in staged sections, keeping your live services up while we migrate. The changeover plan — including the rollback plan — is agreed before anyone picks up a tool.
What does the maintenance SLA actually commit to?
Published response tiers (from next-business-day to round-the-clock), monitoring and a monthly report. The tier you subscribe to is the tier we honour — it’s written into the agreement, not a marketing line.
Can existing cabling be reused?
Often, yes — after we test it. Every legacy link is certified during the survey; anything that passes is integrated and labelled, anything that doesn’t is flagged with a replacement quote. No blanket “rip it all out” unless the test results say so.

Where we work

Business premises with real users and real uptime stakes — from a single office to a multi-site rollout.

Offices & multi-site SMEs

Floor-by-floor cabling, comms rooms and staged changeovers that keep every site on the same standard.

Retail & hospitality units

Out-of-hours works, tills and card terminals never offline longer than the plan says.

Light industrial & workshops

Offices, shops and units — cabling that survives dust, racking and forklifts, terminated properly at both ends.

Serviced & co-working floors

Hot-desk floors, meeting rooms and tenant handovers — ports labelled per desk, documented per floor.

How a project runs

Three stages, each with a written output. You always know what happens next.

Site survey notes and floor plan beside an open data cabinet
01 — SURVEY

Fixed-fee site survey

A point-by-point walk of the premises: existing containment, cabinet condition, legacy links tested, requirements noted. You get a topology plan and a written quote — and the survey fee is credited against the project.

Cat6 cables being terminated into the back of a patch panel
02 — BUILD

Install & change over

Cabling pulled to standard, cabinets dressed, new lines configured and cut over in agreed windows — evenings or weekends where the premises demand it, with a rollback plan agreed before we start.

Cable certifier connected to a patch lead during acceptance testing
03 — CERTIFY

Test & hand over

Every link tested, every port labelled, results bound into a handover pack: plans, certificates, labels, photographs. The network is documented on day one — and stays that way under an SLA.

What lands on your desk

Every project closes with the same six-part handover pack — on paper and as files you own. Nothing is “in the engineer’s head”.

Ask for a sample pack
01Port schedule

Every outlet, patch-panel port and switch port mapped to a room and a desk.

02Test certificates

Per-link results from the certifier: pass, fail and the margin it passed by.

03As-built drawings

Rack elevations and cable routes as installed — not as originally designed.

04Labelling register

The naming convention we used, so the next engineer reads the same map.

05Photographic record

Each cabinet before and after: dressed, closed, and showing what changed.

06Parts & warranty record

What was fitted, the channel warranty position, and what it covers.

01
“Tested, not assumed.”
Every link, every time
02
“One physical chain, one owner.”
Survey to SLA — no subcontractor handoff
03
“Documentation is the deliverable.”
Handover packs, not hand-waving

Tell us what’s dropping out.

A fixed-fee survey is the cheapest way to find out what your network is really doing.

Scroll to Top